3 bedroom Apartment for sale in Kololo Kampala Uganda, code: 192902
|
|
|
|
|
NEWLY BUILT APARTMENTS IN A BLOCK OF 20 APARTMENTS
PRICING: First floor is Usd 340000 and each additional floor is Usd 5000 (negotiable)
Developed a little over 28 decimals, with 16 apartments and 1 penthouse, with the perfect combination of indoor and outdoor space- meticulously designed to maximize the flow of light and space with elegant kitchens as aesthetically pleasing as they are convenient
Modern and well built with an amazing views of the golf course
All tarmac access
Features:
16 apartments of 280 square meters of built up area
3 bedrooms all en-suite and with air conditioners
One self contained integral domestic room in each apartment
Two (2) parking bays per unit (dedicated) and 34 parking slots in total
One storage unit for each apartment
3 Spacious balconies
An open plan kitchen
A laundry area
One Schindler elevator (supplied and maintained by a reputable firm)
2,000 liters of water tanks for each apartment with a booster pump
A garbage chute on every floor for trash disposal
An inverter room on every floor
DSTV, Internet line/ WiFi
A fire escape, fire alarm, fire hose and smoke detectors
CCTV cameras and an electric fence
24/7 security on the premises
A large Gym room
Sauna
Steam room
Swimming pool
Standalone backup generator
|
|
|
|
|
SCAN QR CODE
192902
|
|
|
|
|
|
|
|
80 RELATED PROPERTIES
(Related by price or location and type) |
|
|
HIGH CONSTRUCTION COSTS IN UGANDA, WHY IS THAT?
Uganda, the vibrant East African nation known for its rich cultural heritage and stunning landscapes, has been witnessing a surge in construction activities in recent years. However, one pressing challenge that often hampers the progress of construction projects is the issue of high construction costs. These escalating costs can impede infrastructure development, housing initiatives, and overall economic growth. In this blog, we delve into the various factors contributing to the high construction costs in Uganda, shedding light on the challenges faced by the construction industry and exploring potential solutions.
Limited local production and reliance on imported materials:
One of the primary factors driving up construction costs in Uganda is the limited local production of construction materials. The construction industry heavily depends on imported materials such as cement, steel, glass, and machinery, leading to increased expenses due to transportation costs, import duties,
|
|
|
|
|
ENTER YOUR DETAILS BELOW AND LYNN WILL CALL YOU BACK REGARDING THE PROPERTY WITH CODE# 192902
|
|